Energy
Detailed cap-and-trade and offset arrangements exist for power generation; other energy subsectors require route-specific review.
- Regulator
- Ministry of Energy and Mineral Resources
- Rule base
- ESDM 16/2022
- Unit route
- PTBAE-PU / SPE-GRK
The umbrella framework is national; implementation is sector-led. The lead ministry changes documents, approvals, eligible activities, verifier scope and potentially state revenue.
Detailed cap-and-trade and offset arrangements exist for power generation; other energy subsectors require route-specific review.
The clearest post-110/2025 project process, including international-standard issuance and express PNBP treatment.
Waste methodologies and LVV scopes exist, but a dedicated post-110/2025 sector procedure was not identified.
Relevant for feedstock, soil application and NDC allocation; no dedicated post-110/2025 carbon-trading rule was identified.
Potential home for production-technology projects; classification and ministry approval must be confirmed before investment.
Blue-carbon procedure exists, but compatibility with the new umbrella regulation and SRUK workflow needs checking.
A plantation residue, municipal organic waste and industrial biomass stream can lead to different regulators even when the same pyrolysis technology is used.
OriginWho controls the biomass and land?
TransformationIs the regulated activity waste treatment, agriculture or manufacturing?
ApplicationWhere is the biochar stored and who owns the carbon right?
NDC allocationWhich sector counts the mitigation outcome?
Map feedstock origin, land tenure, facility permits, end use and NDC sector; attach primary permits.
Ask the likely lead ministry and KLH/BPLH to confirm documents, registry sequence and unit form.
Budget schedule and cost contingencies until the sector pathway, LVV scope and tariff basis are confirmed.